iHome Renovation
Completed bathroom renovation with walk-in shower in Toronto
Bathrooms built from the substrate out

Bathroom renovation contractor in Toronto

The finish is only the visible part of a bathroom renovation. The work behind the tile—framing, plumbing, ventilation, substrate preparation, and waterproofing—determines whether the room performs properly. We manage both the hidden work and the final installation.

Defined scope

What your bathroom renovation can include

We coordinate the room as one assembly, not as a collection of separate fixtures and finishes.

  1. 01

    Demolition and preparation

    Remove the existing finishes and inspect the exposed conditions before rebuilding.

  2. 02

    Plumbing and drainage

    Coordinate approved fixture locations, valves, drains, and required plumbing work.

  3. 03

    Waterproofing

    Prepare wet areas with a complete waterproofing approach before tile installation.

  4. 04

    Electrical and ventilation

    Coordinate lighting, receptacles, heating where specified, and effective exhaust ventilation.

  5. 05

    Tile and fixtures

    Install tile, vanity, shower components, tub, toilet, accessories, and finish details.

  6. 06

    Permit coordination

    Review the scope and arrange required permits and inspections where applicable.

Oak millwork and steel detailing in a renovated Toronto home

Before construction

Good bathroom planning starts behind the walls

Moving fixtures can improve the room, but it also changes drainage, venting, supply lines, and sometimes structure. Large-format tile, curbless showers, niches, and wall-mounted fixtures also need the right preparation.

We resolve those details before finishes go in so the bathroom is built in the correct order.

Decisions to make early

  • Fixture locations and clearances
  • Shower or tub waterproofing details
  • Ventilation and lighting
  • Storage, accessibility, and daily use

One accountable team

How we manage the work

  1. 01

    Site visit

    We review the property, your priorities, and the practical conditions that affect the scope.

  2. 02

    Scope and quote

    We define the work, identify required approvals, and provide a written fixed price quote.

  3. 03

    Managed construction

    One project manager coordinates our crews, schedule, inspections, and daily site clean-up.

  4. 04

    Final walkthrough

    We review the completed work with you and provide the written workmanship warranty.

Plan before work starts

Toronto Renovation Planning Checklist

Organize your priorities, site details, and questions before you request a quote.

Common questions

Bathroom renovation questions

How do you waterproof a renovated bathroom?

The waterproofing method is selected for the approved shower or tub assembly and installed before tile. The full approach is included in the project scope rather than left as an on-site decision.

Can you change the bathroom layout?

Yes, where the structure and plumbing conditions allow it. We assess fixture clearances, drain and vent locations, and any permit requirements before finalizing the plan.

Do bathroom renovations require permits?

Permit requirements depend on the scope. Changes to plumbing, structure, or other regulated work may require permits. We review this during planning and coordinate required approvals.

Who manages all the bathroom trades?

One project manager coordinates our crews, plumbing, electrical work, waterproofing, tile, fixtures, inspections, and site clean-up.

Begin the conversation

Planning a bathroom renovation?

Start with a site visit, a defined scope, and a written fixed price quote.

(647) 692-5819

Discuss your bathroom renovation

Call nowGet a quote