
Bathroom renovation contractor in Toronto
The finish is only the visible part of a bathroom renovation. The work behind the tile—framing, plumbing, ventilation, substrate preparation, and waterproofing—determines whether the room performs properly. We manage both the hidden work and the final installation.
Defined scope
What your bathroom renovation can include
We coordinate the room as one assembly, not as a collection of separate fixtures and finishes.
- 01
Demolition and preparation
Remove the existing finishes and inspect the exposed conditions before rebuilding.
- 02
Plumbing and drainage
Coordinate approved fixture locations, valves, drains, and required plumbing work.
- 03
Waterproofing
Prepare wet areas with a complete waterproofing approach before tile installation.
- 04
Electrical and ventilation
Coordinate lighting, receptacles, heating where specified, and effective exhaust ventilation.
- 05
Tile and fixtures
Install tile, vanity, shower components, tub, toilet, accessories, and finish details.
- 06
Permit coordination
Review the scope and arrange required permits and inspections where applicable.

Before construction
Good bathroom planning starts behind the walls
Moving fixtures can improve the room, but it also changes drainage, venting, supply lines, and sometimes structure. Large-format tile, curbless showers, niches, and wall-mounted fixtures also need the right preparation.
We resolve those details before finishes go in so the bathroom is built in the correct order.
Decisions to make early
- Fixture locations and clearances
- Shower or tub waterproofing details
- Ventilation and lighting
- Storage, accessibility, and daily use
One accountable team
How we manage the work
- 01
Site visit
We review the property, your priorities, and the practical conditions that affect the scope.
- 02
Scope and quote
We define the work, identify required approvals, and provide a written fixed price quote.
- 03
Managed construction
One project manager coordinates our crews, schedule, inspections, and daily site clean-up.
- 04
Final walkthrough
We review the completed work with you and provide the written workmanship warranty.
Plan before work starts
Toronto Renovation Planning Checklist
Organize your priorities, site details, and questions before you request a quote.
Common questions
Bathroom renovation questions
How do you waterproof a renovated bathroom?
The waterproofing method is selected for the approved shower or tub assembly and installed before tile. The full approach is included in the project scope rather than left as an on-site decision.
Can you change the bathroom layout?
Yes, where the structure and plumbing conditions allow it. We assess fixture clearances, drain and vent locations, and any permit requirements before finalizing the plan.
Do bathroom renovations require permits?
Permit requirements depend on the scope. Changes to plumbing, structure, or other regulated work may require permits. We review this during planning and coordinate required approvals.
Who manages all the bathroom trades?
One project manager coordinates our crews, plumbing, electrical work, waterproofing, tile, fixtures, inspections, and site clean-up.
More ways we can help
Other Toronto renovation services

Begin the conversation
Planning a bathroom renovation?
Start with a site visit, a defined scope, and a written fixed price quote.
(647) 692-5819




